• 0Shopping Cart
Benshaw Inc.
  • Home
  • About Us
    • Overview
    • News and Events
    • Regional Support Centers
    • Leadership Team
    • Media Center
    • Careers
  • Industries Served
    • HVAC/Refrigeration
    • Irrigation & Agriculture
    • Continuous Process Industries
    • Mining/Aggregates/Cement
    • Water/Wastewater
    • Oil & Gas
    • Marine
    • OEM
  • Motor Control Solutions
    • Low Voltage Controls
      • Overview
      • LV Soft Starters
      • Low Voltage Drives
      • Line and Load Reactors
      • Full Voltage Motor Controls
      • OEM Motor Controls
      • Specialty Products
      • Circuit Breakers
    • Medium Voltage Controls
      • Overview
      • MV Soft Starters
      • Full Voltage Assemblies
      • MV Switchgear Assemblies
      • Line-Ups/Motor Control Centers
      • MV Variable Frequency Drives
      • MV IEC Motor Controls
      • Specialty Products
      • Projects
    • Services
      • Overview
      • Commissioning
      • On-Site/Field Service Solutions
      • Warranty & Return Service:
        • Canada
        • USA
      • Factory Service
      • Retrofits
    • Resources
      • Request a Proposal
      • Browse our Document Library
      • Newsletter Subscription
      • Recent News
      • FAQs
  • Contact Us
  • Webstore
    • Shop (USA)
    • Switch to Canadian Webstore
    • View My Account
    • View My Shopping Cart
    • Open Shipment Tracking Tool
    • Checkout
  • Search
  • Menu
You are here: Home / Benshaw Express / Closeout / Misc / 7. AT AC . LONG LEAD FRAME
Awaiting product image

7. AT AC . LONG LEAD FRAME

$1,844.00

All sales are final.Extended Part No: FLTR-V1K12A00

1 in stock

Part No: 2045958 Categories: Closeout, Misc
  • Detailed Description

7. AT AC . LONG LEAD FRAME

Related products

  • Closeout Product

    SPO Class 10 Bimetallic Overload Relay (28-40A – Direct Mount to RSC-50, RSC-65,RSC-75 and RSC-85 Contactors)

    Closeout Special!

    Extended Part No: SPO-85-30A

    Benshaw RMSO/SPO Series Overload Relays are bimetallic-style relays designed to protect AC-3 circuits and motors against overloads, phase failure, long starting times and stalling of the motor.

    Please Note: All closeout sales are final.

    $84.00

    8 in stock

    Add to cart Show Details
  • RFI/EMI, 3PH, 600V, 250AMAX

    All sales are final.Extended Part No: FLTR-KRF0250VCB

    $12,692.00

    10 in stock

    Add to cart Show Details
  • POWERPRO VFD, 0.5HP, 220VAC,1PH,6.5A,Output Current 2.6A

    POWERPRO VFD, 0.5HP, 220VAC,1PH,6.5A,Output Current 2.6A

    Closeout Special!

    Extended Part No: RSI-PPMI-00H5-2-1-B-IP20-IM

    Sensorless vector, closed loop control variable frequency dual voltage drive with variable torque ratings.

    Variable Torque: .5HP / 2.6A

    Standard Duty: .5HP / 2.6A

     

    $338.00 Sale!

    10 in stock

    Add to cart Show Details
  • Closeout Product

    SPO Class 10 Bimetallic Overload Relay (24-36A – Direct Mount to RSC-50, RSC-65,RSC-75 and RSC-85 Contactors)

    Closeout Special!

    Extended Part No: SPO-85-30A

    Benshaw RMSO/SPO Series Overload Relays are bimetallic-style relays designed to protect AC-3 circuits and motors against overloads, phase failure, long starting times and stalling of the motor.

    Please Note: All closeout sales are final.

    $84.00

    52 in stock

    Add to cart Show Details

Benshaw Inc.

Benshaw, Inc.
615 Alpha Drive
Pittsburgh, PA 15238
United States

Benshaw Canada Controls, Inc.
550 Bright Street East
Listowel, Ontario N4W 3W3
Canada

News and Events

  • Benshaw Product Catalog Updates2023 Catalog UpdatesJanuary 13, 2023 - 11:04 am
  • Ball Mill PositioningBall Mill PositioningNovember 16, 2022 - 9:37 am
  • Benshaw M2L Series Medium Voltage VFDMedium Voltage VFD Provides Major Cost SavingsSeptember 28, 2022 - 2:27 pm
  • Aggregate Industry ApplicationsBenshaw Joins OAIMASeptember 23, 2022 - 1:06 pm
  • Motor Control in Pumping ApplicationsMotor Control in Pumping ApplicationsSeptember 15, 2022 - 12:10 pm

Benshaw Inc.

QuickLinks

  • Contact Us
  • Low Voltage Controls
  • Medium Voltage Controls
  • Proposal Request Form
  • Document Library
  • Webstore
© Copyright 2023 - Benshaw Inc.
  • Facebook
  • LinkedIn
  • Benshaw Partner Portal
  • Terms of Use
  • Privacy
RFI/EMI, 3PH, 600V, 120AMAX MONITOR, ELECTRICAL DISTRIBUTON SYSTEM
Scroll to top

This site uses cookies. By continuing to browse the site, you are agreeing to our use of cookies.

OK×

Cookie and Privacy Settings



How we use cookies

We may request cookies to be set on your device. We use cookies to let us know when you visit our websites, how you interact with us, to enrich your user experience, and to customize your relationship with our website.

Click on the different category headings to find out more. You can also change some of your preferences. Note that blocking some types of cookies may impact your experience on our websites and the services we are able to offer.

Essential Website Cookies

These cookies are strictly necessary to provide you with services available through our website and to use some of its features.

Because these cookies are strictly necessary to deliver the website, refuseing them will have impact how our site functions. You always can block or delete cookies by changing your browser settings and force blocking all cookies on this website. But this will always prompt you to accept/refuse cookies when revisiting our site.

We fully respect if you want to refuse cookies but to avoid asking you again and again kindly allow us to store a cookie for that. You are free to opt out any time or opt in for other cookies to get a better experience. If you refuse cookies we will remove all set cookies in our domain.

We provide you with a list of stored cookies on your computer in our domain so you can check what we stored. Due to security reasons we are not able to show or modify cookies from other domains. You can check these in your browser security settings.

Google Analytics Cookies

These cookies collect information that is used either in aggregate form to help us understand how our website is being used or how effective our marketing campaigns are, or to help us customize our website and application for you in order to enhance your experience.

If you do not want that we track your visist to our site you can disable tracking in your browser here:

Other external services

We also use different external services like Google Webfonts, Google Maps, and external Video providers. Since these providers may collect personal data like your IP address we allow you to block them here. Please be aware that this might heavily reduce the functionality and appearance of our site. Changes will take effect once you reload the page.

Google Webfont Settings:

Google Map Settings:

Google reCaptcha Settings:

Vimeo and Youtube video embeds:

Privacy Policy

You can read about our cookies and privacy settings in detail on our Privacy Policy Page.

Privacy
Accept settingsHide notification only