{"id":11546,"date":"2019-05-27T16:02:06","date_gmt":"2019-05-27T20:02:06","guid":{"rendered":"https:\/\/benshaw.com\/?p=11546"},"modified":"2020-04-09T08:55:16","modified_gmt":"2020-04-09T12:55:16","slug":"benshaw-completes-custom-mv-lineup-installation","status":"publish","type":"post","link":"https:\/\/benshaw.com\/benshaw-completes-custom-mv-lineup-installation\/","title":{"rendered":"Benshaw Completes Custom MV Lineup Installation"},"content":{"rendered":"

The Problem<\/h3>\n

Replacement of a GE Power Vac Motor Starting lineup, currently running and installed in an exciting power house. The project has a limited shutdown \/ start up period of 72 hours, which includes decommissioning, installation and start up services.<\/p>\n

<\/p>\n

Benshaw Solution<\/h3>\n

Benshaw provided a custom designed lineup, to replace the previous obsolete GE Power Vac systems. The new system consisted of a dual top \/ bottom Transformer Feeder Sections, one for a 300 KVA disconnect and one for a 150 KVA. Two additional Soft Start sections were added to the lineup a 3000 HP, and a completed spare unit rated for 1500 HP. Since the new lineup needed to be matched up with the existing incoming bus feed, Benshaw provided a custom top hat section along with a customized flexible bus, this allowed for easy installation with a fast turnaround.<\/p>\n

We were able to replace the old line up with an updated unit with additional features and advanced protection. With the help of our distributer, IEM, and a local electrical contractor, a quick turnaround was possible. Benshaw Pittsburgh, working with Benshaw Canada, were able to provide the perfect custom solution.<\/p>\n

The end user is pleased with the results of this project, we have since installed two other lineups, and are currently quoting two additional lineups.<\/p>\n


\n

Electrical Solutions to Mechanical Problems<\/em><\/h3>\n

Benshaw is widely recognized as a leading provider of applied motor control technologies. We thrive on complex applications and work diligently to bring cost-effective solutions to our customers.<\/p>\n

\"Rapid.<\/p>\n","protected":false},"excerpt":{"rendered":"

In a recent project, Benshaw replaced a GE Power Vac motor starting lineup. The project had a limited shutdown\/start up period of 72 hours, which included decommissioning, installation and start up services.<\/p>\n","protected":false},"author":1,"featured_media":27539,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[125,4],"tags":[],"_links":{"self":[{"href":"https:\/\/benshaw.com\/wp-json\/wp\/v2\/posts\/11546"}],"collection":[{"href":"https:\/\/benshaw.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/benshaw.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/benshaw.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/benshaw.com\/wp-json\/wp\/v2\/comments?post=11546"}],"version-history":[{"count":0,"href":"https:\/\/benshaw.com\/wp-json\/wp\/v2\/posts\/11546\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/benshaw.com\/wp-json\/wp\/v2\/media\/27539"}],"wp:attachment":[{"href":"https:\/\/benshaw.com\/wp-json\/wp\/v2\/media?parent=11546"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/benshaw.com\/wp-json\/wp\/v2\/categories?post=11546"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/benshaw.com\/wp-json\/wp\/v2\/tags?post=11546"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}